Appendix 1
Option |
Cost |
Risk |
Improvement Opportunity |
Overall |
1) Do Minimum |
Mandatory upgrades, contract renewal costs, sub-optimal processes (‘pain points’), and limitations to extending the solution externally to generate revenue, makes this option the costliest to maintain. |
Risk of increased cost, and becoming out of date. Serious risk of suppliers withdrawing support (as has happened with older SAP, Oracle and Microsoft products) within a matter of years leaving the council exposed and needing to procure and implement a replacement within a short timescale similar to the situation with Orbis Partners ESCC and SCC. |
Improvement opportunities would be limited to ‘tweaking around the edges’ as the fundamental system designs and architectures cannot be changed. |
Few, if any, of the Strategic objectives set out in para. 3.6 of the report can be delivered. |
2) Optimisation (Solution / Process Enhancement) |
Potentially lower cost than going to market for replacement systems with associated implementation, and would enable some improvement to the current systems, both in process improvement and technology use. |
There is a risk that strategic drivers will not be fully delivered, leading to a full implementation as well. As above, high risk of support for current systems being withdrawn by suppliers. |
There is potential for some process standardisation and streamlining that would increase efficiency. However, the scale of improvement will be limited but there may be some quick wins that could reduce the effort for a future implementation |
This option could only be considered alongside a longer-term full implementation / replacement. This would enable some early benefit realisation and a reduced implementation effort but effectively defers achievement of strategic objectives and carries high risks. |
3) ERP Cloud |
The financial model for this option reflects the higher end of an ERP implementation cost, however, both systems implementation and ongoing license costs can vary significantly depending on the vendor. |
While this option carries the usual change adoption risks common in such transformational programmes, managed well, this option presents the least risk in delivering the strategic objectives and minimises other short and longer term risks. |
Improved business process through significantly greater integration of data, processes and workflows together with enhanced technology to enable automation and linking to digital service offers. Extendable and future proofed solution will enable greater revenue generation. |
This option will deliver savings, enabling automation through streamlined processes and integrated technology, improved data quality and enabling better business insight due to an all-in-one, highly integrated solution. There is medium to high probability of strategic objectives being met. |
4) Best of Breed |
The 13-year projected cost is similar to that of an ERP solution and while some savings can be made through optimised processes and enhanced technology, the ongoing support model of multiple systems is more costly |
Higher risk of lack of integration, automation and single source of truth. |
Greater functionality can be harnessed through newer technology, however there are challenges to integration and automate |
Overall, this option provides improvement opportunities at similar cost to a one ERP solution, but carries higher risk in delivering the strategic drivers |
· there would be no improvement to existing processes or functionality and no alignment with the identified strategic objectives;
· the existing back office systems are not considered fit for purpose; they are not user friendly, lack functionality and are difficult to use due to the technology being outdated;
· officers would be required to continue using outdated technology that is difficult to use and lacking functionality;
· the council will continue to operate inefficiently with many non-value adding activities (‘pain points’) through dis-jointed processes and technological barriers to improving workflows;
· current reporting capabilities do not efficiently meet the business needs and access to actionable information will not improve;
· providing functionality to meet legislative and statutory business changes will continue to be relatively expensive and escalate in cost with the council’s increasing IT&D estate complexity;
· officers in support service teams will be unable to move to more value-adding, non-transactional activity without the move to genuine universal self-service systems;
· due to a lack of systems integration there are many instances of dual-processing and dual-keying across different areas and no ‘single source of truth’ in terms of data held;
· Currently, licenced software will be left unused, representing sub-optimal value-for-money;
· Due to the age of the systems, there remains a significant risk of suppliers withdrawing support for the systems within a matter of years as has happened with older SAP, Oracle and Microsoft solutions recently.
· Mandatory upgrades, contract renewal costs, sub-optimal processes, and limitation to extend the solution externally to generate revenue, makes this option high risk and costly.
· only partial improvement and limited alignment with identified strategic objectives would be possible;
· business change costs, including management and staff training and support, will continue to need a costly support model to remain legally compliant and ensure the adequacy of internal controls due to the fragmented and customised systems estate;
· officers would be required to continue using outdated technology that is difficult to use and lacks functionality and capability;
· processes will remain fragmented and inefficient, with duplicate handling of transactional data without further, costly technology to interface the current solutions, improve integration and propagate master data across platforms;
· the current plethora of technology solutions and customisations makes the estate fragile and unable to be flexed with changing business, legal and statutory requirements;
· the council would need effectively need to undertake two significant/major upgrades/implementations within the next 10 years instead of one, which leads to greater cost and risk to the council.
· technology that is a better fit with the council’s requirements and the identified strategic drivers for change;
· providing current technology with much enhanced integration, (mobile/remote) access, usability, input validation, self-service, workflow and reporting and dashboarding capabilities;
· opportunities to simplify the systems estate and provide, resilience, flexibility, and the necessary interfacing to enable much improved and simpler information management to provide a single source of truth for master data;
· a reduction in licencing costs by removing niche and unnecessary add-on modules and intermediary products that make up for gaps in current systems capability;
· opportunities to re-configure the technology and reference data to meet future needs, not replicating the past;
· enabling some savings, however, this would be suppressed due to the higher ongoing support cost of different systems.
· the requirement for developing interfaces between solutions to provide a fully integrated solution will add significant cost and complexity to the implementation and ongoing maintenance;
· consequently, there would be additional cost, effort, and risk to migrate current data across to separate solutions;
· there will be more than one supplier to manage, including the relationship between them, together with multiple relationships with incumbent “feeder” system suppliers. This will make contract management and performance management very challenging as suppliers often point to other elements of the estate as the cause of performance or processing issues;
· with different systems and no common user interface (GUI), there would be a greater business change effort to prepare, deliver and embed changes to policies, processes and working practices;
· in theory, the 13-year projected cost is similar to that of an ERP solution (Option 3) on the assumption that the best of breed estate can be implemented successfully and thereby achieves the desired aims and strategic objectives. However, the risk of an unsuccessful implementation that fails to meet all strategic objectives is significantly higher than for single supplier ERP (Option 4) and therefore the risk to achieving cashable savings is also higher;
· the council may need continued support from a third-party to manage their solution, depending on any customisations needed, where the out-of-the-box, vanilla solutions do not meet the council’s requirements;
· alignment of implementation periods is likely to be very challenging, given the different data migration requirements, which will introduce complexity and risk to the programme;
· data quality and migration – moving to new solutions may require extensive data quality remediation to ensure data is clean and ready for migration prior to Go Live on the new solutions; there is an inherently more challenging data migration path for this option due to migrating to more than one new system;
· lack of capacity and capability within the council, or through labour market shortages, to drive and deliver the programme.
· moving to a cloud ERP solution creates a single source of truth for master data, which for a Best of Breed solution is unproven until implemented and therefore carries much higher risk. An ERP reduces the need for ‘stitching’ multiple data sources together to create uniform management information;
· there is a simpler data migration path (i.e. to one system solution) and consequently fewer third parties involved, considerably reducing implementation and delivery risks;
· the council can look to improve its reporting and business processes through the adopt-not-adapt ethos, helping it to achieve future savings through simpler and fewer processes, reduced interfacing and workflow exchanges e.g. web forms not having to pass through multiple systems, security protocols and authorisation processes;
· when analysing the system suppliers against the council’s strategic objectives, ERP solutions appeared to be the best fit for the future direction of the organisation.
· only having one prime IT contractor to manage;
· technology that can specified at the outset to be configured close to the council’s requirements (i.e. out of the box) and conform with the identified strategic objectives for change;
· access to the most up-to-date technology with optimal integration, (mobile/remote) access, usability, input validation, self-service, workflow and reporting and dashboarding capabilities as modern ERP systems are the leading edge for corporate systems solutions;
· a less complex estate than all other options providing enhanced resilience, security, flexibility and integration and, critically, providing a single source of truth for master data management;
· reduction in licencing costs by removing niche and intermediary products;
· optimising self-service which will enable resources to be redirected to value-adding professional and advisory services;
· providing an evergreen solution, regularly updated and patched by the supplier as part of the contract with minimal disruption or intervention;
· the lowest long term infrastructure and maintenance costs.
[1] An ERP (Enterprise Resource Planning) system solution is the industry term for an IT system that combines and integrates an organisation’s core business processes including financial, HR, Payroll, Procurement, Recruitment and other processes and functions onto one platform.